hon alderman and former Mayor of Guildford
Traffic on this through route almost reaches grid lock already.
How on earth can our infrastructure cope with this development?
Is this a prelude for further schemes?
This website is published by The Guildford Dragon NEWS
Contact: Martin Giles mgilesdragon@gmail.com
Log in- Posts - Add New - Powered by WordPress - Designed by Gabfire Themes
Ben Paton
January 23, 2018 at 4:56 pm
Didn’t the leader of the council promise that no developments would proceed without adequate infrastructure?
Surely he has the answer then?
Valerie Thompson
January 23, 2018 at 5:50 pm
I presume that Solum will replace the decaying bridge at the bottom of Farnham Road with one twice the width, before they bring hundreds of lorries to the site, possibly using the route from the A3 past the Cathedral. If they do not, I anticipate that these lorries will end up on the railway line when the bridge collapses.