Fringe Box

Socialize

Twitter

Highways Repair Bulletin July 24

Published on: 24 Jul, 2023
Updated on: 25 Jul, 2023

Drivers are advised of changes to A3 and A245 next week.

National Highways announced that improvements are aimed at reducing congestion along the A3 and A245 at the Painshill junction just north of M25/A3 junction 10.

The new road layout will be live from 6am today, Monday July 24.

Before National Highways can start the main package of road improvements, the A245 carriageway will need to be reduced to one lane westbound between Painshill and the junction with Seven Hills Road.

This is to allow for the safe removal of gas pipes and electrical cables that are currently in the way.

There will also be weeknight overnight closures on the same stretch heading eastbound. These overnight closures will be in place until September 2023.

A fully signed diversion will be in place via B365, A317 and A244. The A245 and surrounding roads are expected to be busy, so drivers are being advised to plan ahead and allow extra time for their journeys.

The diversion route is designed for all vehicle types. National Highway is advising motorists not to use a SatNav when following the diversion because there is a risk it could direct drivers down an unsuitable road or towards a closed road.

The carriageway upgrade is part of National Highways M25 J10 improvement scheme at Wisley, which will upgrade the M25 junction with the A3 Wisley Interchange to reduce congestion, improve safety and create more reliable journeys.

The scheme will also see improvements made to the A245, which will increase from two to three lanes westbound as it approaches the Seven Hills Road junction from the Painshill. Further upgrades include:

  • There will be an extra lane towards the eastbound traffic light entry point to the Painshill roundabout.
  • The traffic lights at Seven Hills Road will be re-phased to improve traffic flow with changes to the turns you can make from our approaches.
  • On the roundabout, new pedestrian crossing points will be installed at the southbound entry and northbound exit slips to improve safety.
  • The A3 northbound exit slip to Painshill will be widened.
  • The A3 will also increase from three to four lanes in both directions between the Painshill junction and the M25.

For further details on upcoming closures information please visit: htps://www.nationalhighways.co.uk/m25j10

Guildford roadworks

This week there will be road or lane closures in: Guildford (Bridge Street, Eagle Road, Epsom Road, Finch Road, Hartshill, Larch Avenue, North Street,  Swan Lane, Westfield Road, Woodbridge Road) Tongham, and Worplesdon.

Traffic light signals or stop/go signs will be operating in:  Artington, Ash, Ash Vale, Chilworth, East Horsley, Guildford (Aldershot Road, Epsom Road, Leapale Road, Portsmouth Road, Quarry Street, Walnut Tree Close and York Road), Normandy, Peasmarsh, Ripley, Send, Shalford, and Wood Street.

See list below for further details. It is published by Surrey County Council and is also available on the SCC website. It shows the current works planned or underway in the borough.

Any questions should be directed to the county council at: works.communication@surreycc.gov.uk.

Please click on images to enlarge.

Article from Surrey County Council

Share This Post

Leave a Comment

Please see our comments policy. All comments are moderated and may take time to appear.

Your email address will not be published. Required fields are marked *